{"id":491,"date":"2009-08-06T11:01:00","date_gmt":"2009-08-06T15:01:00","guid":{"rendered":"http:\/\/atotw.com\/archive\/?p=491"},"modified":"2009-08-06T11:01:00","modified_gmt":"2009-08-06T15:01:00","slug":"route-53-update","status":"publish","type":"post","link":"https:\/\/atotw.com\/archive\/?p=491","title":{"rendered":"Route 53 update"},"content":{"rendered":"<div class=\"3DSection1\">\n<p class=\"3DMsoNormal\">Dear fellow Hanoverians:<\/p>\n<p class=\"3DMsoNormal\">&nbsp;<\/p>\n<p class=\"3DMsoNormal\">We have all dodged the cones and trucks along the =<br \/>\nnorthern\/middle<br \/>\nportion of Route 53 for the past year and a half and work is progressing =<br \/>\nquite<br \/>\nnicely.&nbsp; As someone who commutes through this portion of Route 53 =<br \/>\nmost days, I<br \/>\nhave to say that the project has been managed very well and delays have =<br \/>\nmostly<br \/>\nbeen kept to a minimum. &nbsp;Good news &#8211; the Route 53 bridge over Route =<br \/>\n3 is about<br \/>\nto finally be reconstructed, too.&nbsp; Hooray!&nbsp; More delays, but =<br \/>\nall for the<br \/>\neventual good.&nbsp; Below please find an update from the Planning =<br \/>\nDepartment<br \/>\nregarding both of those projects, with special thanks to Andy Port, Town =<br \/>\nPlanner:<\/p>\n<p class=\"3DMsoNormal\">&nbsp;<\/p>\n<p><b><u><span>Route 53 (Washington =<br \/>\nStreet)<br \/>\n\/ Route 3 Bridge:<\/span><\/u><\/b><span>=<br \/>\n<\/span><\/p>\n<p><span>&nbsp;<\/span><\/p>\n<p><span>In mid-August 2009, the =<br \/>\nMassachusetts<br \/>\nHighway Department (MHD), through their consultant contractor (Aetna =<br \/>\nBridge<br \/>\nCompany) will re-start work on the long-awaited reconstruction of the<br \/>\nWashington Street (Route 53) over Route 3 bridge.&nbsp; The anticipated<br \/>\ncompletion date for this project is July, 2012.&nbsp; The location of =<br \/>\nthis<br \/>\nproject is shown on the map above.<\/span><\/p>\n<p><span>&nbsp;<\/span><\/p>\n<p><span>The Bridge crossing will remain OPEN =<br \/>\nduring<br \/>\nconstruction.&nbsp; MassHighway and the Town ask for patience from the =<br \/>\npublic<br \/>\nas this important traffic improvement project is underway.&nbsp; =<br \/>\nHowever, there<br \/>\nmay be some delays due to limited lane width and work space.&nbsp; As =<br \/>\nsuch we<br \/>\nanticipate that residents, businesses, commuters, and the general public =<br \/>\nwill<br \/>\nconsider <b>alternative routes <\/b>as they deem =<br \/>\nnecessary.<\/span><\/p>\n<p><span>&nbsp;<\/span><\/p>\n<p><b><u><span>Route 53 (Washington =<br \/>\nStreet)<br \/>\nRoadway Widening:<\/span><\/u><\/b><span>=<br \/>\n<\/span><\/p>\n<p><span>&nbsp;<\/span><\/p>\n<p><span>Since April 2008, the Massachusetts =<br \/>\nHighway<br \/>\nDepartment (MHD), through their consultant contractor (Paolini =<br \/>\nCorporation) has<br \/>\nbeen widening an approximately one-mile length of Washington Street =<br \/>\n(Route 53)<br \/>\nin Hanover.&nbsp; The limits of this widening project are between Mill =<br \/>\nStreet<br \/>\nand Pond Street\/Rawson Road.<\/span><\/p>\n<p><span>&nbsp;<\/span><\/p>\n<p><b><span>Between August 4 &amp; 7, 2009 the<br \/>\ncontractor will be conducting final paving operations on the northern =<br \/>\nsection<br \/>\nof this stretch of road.<\/span><\/b><span><\/span><\/p>\n<p><span>&nbsp;<\/span><\/p>\n<p><b><span>Between August 10 &amp; 11, 2009, =<br \/>\nthe<br \/>\ncontractor will be installing roadway lane striping.<\/span><\/b><span>=<br \/>\n<\/span><\/p>\n<p><span>&nbsp;<\/span><\/p>\n<p><span>The remainder of the project =<br \/>\n(southern<br \/>\nroadway section) will be completed between August 2009 and October =<br \/>\n2010.<\/span><\/p>\n<p><span>&nbsp;<\/span><\/p>\n<p><span>Businesses on Route 53, including =<br \/>\nthose<br \/>\nalong this stretch of Route 53 will remain OPEN during =<br \/>\nconstruction.&nbsp;<br \/>\nMassHighway and the Town ask for patience from the public as this =<br \/>\nimportant<br \/>\ntraffic improvement project is underway.&nbsp; While this stretch of =<br \/>\nRoute 53<br \/>\nwill remain open to traffic during construction, there may be some =<br \/>\ndelays due<br \/>\nto limited lane width and work space.&nbsp; As such we anticipate that<br \/>\nresidents, businesses, commuters, and the general public will consider =<br \/>\n<b>alternative<br \/>\nroutes <\/b>as they deem necessary.<\/span><\/p>\n<p><span>&nbsp;<\/span><\/p>\n<p><span>The project, once completed, will =<br \/>\nprovide<br \/>\nadditional lane capacity and a middle turning lane, matching the =<br \/>\nalignment<br \/>\nalong Washington Street near the Hanover Mall.&nbsp; The anticipated =<br \/>\ncompletion date<br \/>\nfor this project is October 1, 2010.<\/span><\/p>\n<p><span>&nbsp;<\/span><\/p>\n<p><span>If you have any questions concerns =<br \/>\nor<br \/>\ncomplaints about work during the construction period, please contact the =<br \/>\nTown<br \/>\nof Hanover Planning Office (781-826-7641).&nbsp; Detailed plans of the =<br \/>\nproject<br \/>\nare available in the office for those who have concerns about the =<br \/>\nproject other<br \/>\nthan general questions.<\/span><\/p>\n<p class=\"3DMsoNormal\">&nbsp;<\/p>\n<p class=\"3DMsoNormal\">For &quot;Around Town on the =<br \/>\nWeb&quot;,<\/p>\n<p class=\"3DMsoNormal\">Cathy H-B<\/p>\n<p class=\"3DMsoNormal\">&nbsp;<\/p>\n<p class=\"3DMsoNormal\">&quot;Around Town on the Web&quot; is a community =<br \/>\nservice<br \/>\nthat has been provided to self-selected residents of the Town of Hanover =<br \/>\nsince<br \/>\nthe spring of 2004.&nbsp; If someone forwarded this message to you and =<br \/>\nyou would<br \/>\nlike to receive these communications directly, please e-mail your first =<br \/>\nand<br \/>\nlast name and e-mail address to <span>cathyhb@atotw.com<\/span> .&nbsp; If you would =<br \/>\nlike to be<br \/>\nremoved from this distribution list, please e-mail your request to me at =<br \/>\n<span>cathyhb@atotw.com<\/span><br \/>\n.&nbsp; For submission guidelines and answers to frequently asked =<br \/>\nquestions about<br \/>\n&quot;ATOTW&quot;, please go to <u><span>www.atotw.com<\/span><\/u><br \/>\n.&nbsp; To search for archived &quot;ATOTW&quot; news, just go to =<br \/>\n<u><span>https:\/\/atotw.com\/archive<\/span><\/u> =<br \/>\n.<\/p>\n<p class=\"3DMsoNormal\">&nbsp;<\/p>\n<p class=\"3DMsoNormal\">&nbsp;<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Dear fellow Hanoverians: &nbsp; We have all dodged the cones and trucks along the = northern\/middle portion of Route 53 for the past year and a half and work is progressing = quite nicely.&nbsp; As someone who commutes through this &hellip; <a href=\"https:\/\/atotw.com\/archive\/?p=491\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"class_list":["post-491","post","type-post","status-publish","format-standard","hentry","category-atotw_archive"],"_links":{"self":[{"href":"https:\/\/atotw.com\/archive\/index.php?rest_route=\/wp\/v2\/posts\/491","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/atotw.com\/archive\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/atotw.com\/archive\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/atotw.com\/archive\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/atotw.com\/archive\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=491"}],"version-history":[{"count":0,"href":"https:\/\/atotw.com\/archive\/index.php?rest_route=\/wp\/v2\/posts\/491\/revisions"}],"wp:attachment":[{"href":"https:\/\/atotw.com\/archive\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=491"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/atotw.com\/archive\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=491"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/atotw.com\/archive\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=491"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}